Overview
The PROJECTTURNOVERAMOUNT function calculates the turnover amount of one or more project(s) and task(s) over a given period.
Syntax
=PROJECTTURNOVERAMOUNT(
ConnectionName,
Project,
Task,
AccountGroup,
CostCode,
InventoryItem,
FromPeriodOrDate,
ToPeriodOrDate,
Branch,
UseProjectCurrency,
UseMasterFinancialCalendar
)
Arguments
The PROJECTTURNOVERAMOUNT function uses the following arguments (see our article on Filtering Velixo functions):
|
Argument |
Required/Optional |
Description |
|
|
Optional |
Provide one of the following values:
OR Omit the argument to return results for all compatible connections with default aggregation settings. |
|
|
Required |
The Project(s) to include |
|
|
Optional |
The Task(s) to include |
|
|
Optional |
The Account Group(s) to include |
|
|
Optional |
The Cost Code(s) to include |
|
|
Optional |
The Inventory Item(s) to include |
|
|
Required |
Starting financial period in MM-YYYY format OR Specified date (Acumatica 2025R2 or newer) |
|
|
Required |
Ending financial period in MM-YYYY format OR Specified date (Acumatica 2025R2 or newer) |
|
|
Optional |
The IDs of the Branches to include |
|
|
Optional |
|
|
|
Optional |
Use Acumatica's Master Financial Calendar instead of the financial calendar defined within the specific tenant associated with the connection being accessed (this can be useful for consolidation reports). Possible values:
Default value:
|
Examples
Example 1
=PROJECTTURNOVERAMOUNT(
"ACE",
"TMR03",
"301 JRCONS",
"LABOR",
,
,
"01-2017",
"12-2017",
,
TRUE
)
Description
Calculates the total cost of Labor for task 301 JRCONS in project TMR03 during the year 2017 and returns the value in the project's defined currency.
Result
500
Example 2
Assuming this data on the Project Transaction Detail page of the ERP:
=PROJECTTURNOVERAMOUNT(
"ACE",
"1002HOTEL",
"01",
"LABOR",
"01-313",
,
"04-2020",
"04-2020"
)
Description
Calculates the total cost of Labor associated with cost code 01-313 for task 01 in project 1002HOTEL during period 4 of year 2020.
Result
1,920