Description
The PROJECTCHANGEORDERQUANTITY function calculates the change order quantity of one or more projects and tasks.
Syntax
PROJECTCHANGEORDERQUANTITY(Connection, Project, Task, AccountGroup, CostCode, InventoryItem)
The PROJECTCHANGEORDERQUANTITY function uses the following parameters (see our article on Filtering Velixo functions):
Parameter | Required/Optional | Description |
Connection | Required | The name of the connection as configured in the Connection Manager |
Project | Required | The Project(s) to include |
Task | Optional | The Task(s) to include |
AccountGroup | Optional | The Account Group(s) to include |
CostCode | Optional | The Cost Code(s) to include |
InventoryItem | Optional | The Inventory Item(s) to include |
Example
=PROJECTCHANGEORDERQUANTITY("Demo","2017CU01", "02", "SUB", "02450", "<N/A>")
Description
Calculates the change order quantity of task 02 in the 2017CU01 project (filtered by AccountGroup=SUB, CostCode=02450, and InventoryItem=<N/A>)
Result
1
Applies to
PM Module