Description

The PROJECTCHANGEORDERAMOUNT function calculates the change order amount of one or more project(s) and task(s).

Syntax

PROJECTCHANGEORDERAMOUNT(Connection, Project, Task, AccountGroup,
CostCode, InventoryItem, UseProjectCurrency)

The PROJECTCHANGEORDERAMOUNT function uses the following parameters (see our article on Filtering Velixo functions):

Parameter

Required/Optional

Description

Connection

Required

The name of the connection as configured in the Connection Manager

Project

Required

The Project(s) to include

Task

Optional

The Task(s) to include

AccountGroup

Optional

The Account Group(s) to include

CostCode

Optional

The Cost Code(s) to include

InventoryItem

Optional

The Inventory Item(s) to include

UseProjectCurrency

Optional

TRUE/FALSE value indicating if the amount should be returned in the project's currency (default = FALSE)

Example

=PROJECTCHANGEORDERAMOUNT("Demo","2017CU01", "02", "SUB", "02450",
"<N/A>", TRUE)

Description

Calculates the change order amount of the 02 task in the 2017CU01 project (filtered by: AccountGroup=SUB, CostCode=02450, and InventoryItem=<N/A>) and returns the value in the project's defined currency

Result

2000

Applies to

PM Module